The Vinyl Liner Pool Construction Process
Bos 1
Bos 2
Bos 3
Bos 4
Bos 7
Bos 8
The crew and equipment arrive at the job site.
The pool site is excavated.
Containment forms and plumbing are placed.
Bos 9
Bos 10
Bos 11

Concrete is placed for the inside pool cavity
and to stabilize the containment forms.

Bos 12
Bos 14
The Pool Liner and support equipment is installed.
Check out the Vinyl Liner Selections.
Bos 17
Bos 18
Bos 19
Bos 21
Bos 22
Bos 25
The pool surroundings are backfilled, the deck
is built, steps and diving board are set and
after a final inspection the pool is turned over
to the owner.
Click on Thumbnails for larger image